Picture of pad matl
Monday, October 31, 2011
Friday, October 28, 2011
Friday, October 21, 2011
Thursday, October 20, 2011
cool cloudy
Wednesday, October 19, 2011
Tuesday, October 18, 2011
Wednesday, October 12, 2011
Tags for masonry
Spoke to Nathan of Mets. Told him no tags. Asked paul zolezzi to send letter from Mets saying no testing and wc results to me and Nathan
Clear cool, continued placing 2nd lift set 93 , 101, and 20 ft of 83
Continued wall 93 and 101, place masonry block. pour 10am on Wednesday
RAYCON
Diego Mercado MF F250 8H46907
Hector magdeleno M
Armando magdeleno M
Martin Ramirez M
Andres Flores M
Tomas Molina M
Rigoberto Meza AM
Pedro Rodriguez l
Vincent oleo l
Jeff Salazar LF
Ondrej Zafranek L
Juan Mendoza L
Oscar Valenzuela L weds only
Pablo garcia L weds only pumper
Water truck
Grout mixer
Water pump
2 Forklifts
Monday, October 10, 2011
Clear cool
Placed grout for first lift of wall 93 and 101. Pour started at 11:00 ended at 1:20
RAYCON
Diego Mercado MF F250 8H46907
Hector magdeleno M
Armando magdeleno M
Victor Oleo M
Pedro Rodriguez M
Martin Ramirez M
Andres Flores M
Tomas Molina M
Rigoberto Meza AM
Jeff Salazar LF
Ondrej Zafranek L
Juan Mendoza L
Water truck
Grout mixer
Water pump
2 Forklifts
Oscar Valenzuela Pump Operator +concrete pump
Friday, October 7, 2011
Clear cool
Started wall 93 and 101, place masonry block. Pointed out type IV wall and that at end of wall, at 2 feet need additional rebar. The access openings are 4 ft instead of 3 so some rebar must be cut. Need to schedule 3 regs str grout pours(20 yd3, from Cemex-Irvine, 10am,mix1520533, Monday,Wednesday and Friday of next week)
RAYCON
Diego Mercado MF F250 8H46907
Hector magdeleno M
Armando magdeleno M
Martin Ramirez M
Andres Flores M
Tomas Molina M
Rigoberto Meza AM
Jeff Salazar LF
Ondrej Zafranek L
Juan Mendoza L
Water truck
Grout mixer
Water pump
2 Forklifts
How to remedy transition
Stopped with Elias. He will look up patching method. Btw that and grinding, we will leave it. Can't make transition great on back be wise of diff style of walls and location of initial exp joints.
Thursday, October 6, 2011
Wednesday, October 5, 2011
Staging block and scaffolding
Since last Thursday. Jeff salazar Lf, Juan Mendoza l, ondrej safranek l, 2 forklifts (kp8n9l and y5) 8 hours. Will start laying tomorrow.
Cloudy, may rain soon